Surveying Part 1

Concept-focused guide for Surveying Part 1.

~7 min read

Surveying Part 1
Advertisement

Overview

Welcome, future civil engineers! In this learning article, we’ll break down the essential concepts you’ll encounter on the Surveying Part 1 quiz, designed especially for those preparing for the Civil Engineering Board exam in the Philippines. We’ll cover the technical foundations of surveying, data analysis, engineering economy, numerical methods, and physics for engineers. By the end, you’ll have a deeper understanding of the reasoning, formulas, and principles that underpin these crucial civil engineering topics—along with the confidence to tackle related exam questions.


Concept-by-Concept Deep Dive

Surveying Instruments and Methods

Surveying is fundamental to all civil engineering projects—it ensures accurate mapping, layout, and measurement of land and structures. Let’s break down core concepts:

Theodolite and Its Functions

A theodolite is a precision instrument used in surveying to measure both horizontal and vertical angles. It consists of a rotating telescope mounted on a tripod, enabling surveyors to determine positions and elevations.

  • Horizontal Angles: Used to establish property boundaries or layout building corners.
  • Vertical Angles: Used for determining elevation differences.
How to Use a Theodolite
  1. Level the instrument using leveling screws.
  2. Sight the first point and set the horizontal circle to zero.
  3. Rotate to the second point and read the angle.
Common Misconceptions
  • Confusing theodolites with total stations—total stations also measure distances electronically.
  • Assuming a theodolite only measures one type of angle.

Triangulation and Angle Measurement

Triangulation is a surveying method that determines locations by forming triangles from known points.

  • Basic Steps:
    1. Identify a baseline of known length.
    2. Measure angles from each endpoint to a third point.
    3. Use trigonometry to solve for unknown distances.
Fixing Errors
  • Ensure all angles are measured precisely; small errors can cause large positional inaccuracies.

Engineering Data Analysis & Numerical Methods

Civil engineering relies on the interpretation of large sets of data and the use of algorithms to solve complex problems.

Common Data Analysis Methods

The most prevalent technique in civil engineering is statistical analysis, which helps interpret experimental or field data.

  • Regression Analysis: Used to model relationships between variables.
  • Error Analysis: Identifies and quantifies measurement uncertainties.
Step-by-Step Data Analysis
  1. Collect data from field or laboratory.
  2. Organize data in tables or software.
  3. Apply statistical tools (mean, standard deviation, regression).
  4. Interpret results in engineering context.
Pitfalls
  • Ignoring outliers without investigation.
  • Misapplying statistical models to inappropriate datasets.

Numerical Solution of Equations

Numerical methods like the Bisection Method help solve equations that can’t be solved analytically.

Bisection Method
  • Used for finding roots of continuous functions.
  • It repeatedly halves an interval and selects the subinterval in which the sign changes, converging on the root.

Steps:

  1. Choose initial interval [a,b][a, b] where f(a)f(a) and f(b)f(b) have opposite signs.
  2. Compute midpoint c=(a+b)/2c = (a+b)/2.
  3. Determine the sign of f(c)f(c); replace aa or bb with cc accordingly.
  4. Repeat until desired precision is reached.
Misconceptions
  • Not checking if initial interval actually brackets a root.
  • Ignoring convergence criteria.

Engineering Economy: Present and Future Worth

Civil engineers must evaluate the economic viability of projects using financial mathematics.

Present Worth and Future Worth

  • Present Worth (PW): The current value of a future sum, discounted at a specific interest rate.
  • Future Worth (FW): The value of a present amount at a future date, compounded at a given interest rate.
Key Formulas
  • Present Worth: PW=F/(1+i)nPW = F / (1 + i)^n
  • Future Worth: F=P×(1+i)nF = P \times (1 + i)^n

Where:

  • PP: Present value
  • FF: Future value
  • ii: Interest rate per period
  • nn: Number of periods
Application Steps
  1. Identify the cash flow (present or future).
  2. Determine the interest rate and number of periods.

🔒 Continue Reading with Premium

Unlock the full vlog content, professor narration, and all additional sections with a one-time premium upgrade.

One-time payment • Lifetime access • Support development

Advertisement
Was this helpful?

Join us to receive notifications about our new vlogs/quizzes by subscribing here!

Advertisement